Plan the next shift
Prepare a visible sequence of content before the operator goes offline.
On this page
Add a content commitment
- 1
Open the content plan
Choose a saved project and find Keep the next shift covered. Expand Add a content commitment.
- 2
Set the content and time
Enter a title, a planned time in your browser’s timezone, and a draft caption.
- 3
Attach a finished image
Select a delivered image from the same project. A complete commitment has both a caption and an image.
- 4
Save and inspect
Save the commitment, then open Preview investor view to inspect its visible preparation state.
A plan is a sequence of states
| State | Evidence |
|---|---|
| Planned | A saved commitment; the asset or caption may be missing. |
| Asset prepared | A finished image and caption are attached to a future commitment. |
| Time passed · unposted | The planned time passed without a verified publication. |
| Cancelled | The commitment is retained but no longer counted as upcoming. |
| Scheduled / Published | Require a publishing integration and confirmation. Unavailable in this pilot. |
Check coverage before going offline
The next-eight-hours count includes future, uncancelled commitments with a caption and a finished image. If there are none, the studio shows an in-app preparation warning.
This is a count of prepared items, not a promise of continuous posting coverage. There are no push notifications or email reminders. Check the planned timezone and review each item before relying on the plan.
Change a commitment
Use Cancel to retire an existing commitment, then add a replacement with the corrected time or content. The cancelled record stays visible. Refresh plan to load current records after working in another tab.